• Shop by category
  • Powered by eBay
  • Planning and Control Using Oracle Primavera P6 Versions 18 to 23 PPM Professiona

    • Item No : 387278401328
    • Condition : Brand New
    • Brand : No brand Info
    • Seller : grandeagleretail
    • Current Bid : US $118.01
    • * Item Description

    • All scheduling software is difficult to learn for a number of reasons. None have the optimal settings when installed and Layouts, User Preferences and default options need to be adjusted to obtain the best possible performance.
    ★ Recommended Products Related To This Item
    ♥ Best Selling Products in this category