• Shop by category
  • Powered by eBay
  • Planning and Control Using Oracle Primavera P6 Versions 18 to 23 PPM Professiona

    • Item No : 156346120429
    • Condition : Brand New
    • Brand : No brand Info
    • Seller : the_nile
    • Current Bid : US $105.79
    • * Item Description

    • The extent of the material covered by the book ensures that the manual remains a source of useful reference even after the initial training has been completed. Jan Hanak, Managing Director, Keen Science Pty Ltd.
    ★ Recommended Products Related To This Item
    ♥ Best Selling Products in this category